Schematic Design and Program Criteria for Future Phases
Phase 2 – School Office and Classroom Addition
General Once construction of Phase 1 of the Fr. Quigley Faith Formation Center is underway, our Capital Campaign Appeal will resume for additional support to ensure that Phase 2 can begin immediately upon completion of Phase 1 construction. Design plans will be developed for all Phase 2 improvements and can be advanced to construction document phase when funding becomes available.
Media Center
· 1 full time librarian - 2 part time aides · No separate office – work at circulation desk · No traffic through Media center to get between buildings · Use of Media Center in evenings by students / adults as meeting space · Would prefer to have exterior windows in Media Center · Would like visibility / image of media from exterior south facade · Book stacks and space at tables for one classroom of children (28) · Visual control of computer room
Computer room
· Flexible space – laptop computers and carts, not fixed stations · Does want to be a separate space w/ wall off of Media Center · Needs door directly to media · Adult use for satellite classes · 28 kids (1 class) at a time · Video projector / marker board – teaching wall for library instruction / research methods...
Administration
· Reception - 2 work spaces: · Receptionist · Secretary / accounting that watches reception if first is out. · Principal’s office · Assistant Principal · Conference room · In open office area near reception – copier / fax for office staff only (teacher’s workroom in existing building) - space for one parent volunteer to help with office work · Nurse area with cots / treatment · Need public access restrooms – possible to share with Media Center
Kindergarten:
· When all day kindergarten begins we will need two extra kindergarten rooms – size on existing plans is right – allows for nap space · 20 kids per room · School is set up as three track – 1st grade has thee classrooms of 27 = 81 students · Existing building has two kindergarten rooms therefore 80 total students if full day in each room. · If not all Kindergartens are full – one room in existing would become 3rd grade room or extra class.
Storage area - Large storage is for school/campus use
Maintenance area (for entire campus)
· Moving staff out of boiler room in school into and on-grade situation · Use for receiving / storage of supplies · Storing equipment like buffers, cleaners, ladders · Some space may need to be used for mechanical / electrical equipment for school addition · Workstation for maintenance director – paperwork and computer
Current School and PC Classroom Renovations
· Remove temporary classroom in Cafeteria · Replace cafeteria floor · Update Kitchen layout/equipment · Replace original building windows on middle and top level with new energy efficient unit and in-fill to reduce amount of glass · Renovate several rooms in PC lower level due to change in use and traffic
|
|